Customization: | Available |
---|---|
Color: | Red |
Material: | DMD |
Still deciding? Get samples of US$ 1/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product presentation
Properties | Units | Values | |||||||||
Nominal thickness | mm | 0.15 | 0.18 | 0.2 | 0.23 | 0.25 | 0.3 | 0.35 | 0.4 | 0.45 | |
Tolerance | mm | ±0.02 | ±0.025 | ±0.03 | ±0.03 | ±0.03 | ±0.03 | ±0.035 | ±0.040 | ±0.045 | |
Thickness of film | mm | 0.05 | 0.05 | 0.05 | 0.1 | 0.1 | 0.15 | 0.188 | 0.25 | 0.25 | |
Tensile Strength(no bending) | mm | ≥70 | ≥80 | ≥100 | |||||||
Resin content | % | 35±5 | 30±5 | 25±5 | 20±5 | ||||||
Volatile content | % | ≤1.5 | |||||||||
Dielectric strength | mV/m | ≥40 | |||||||||
Breakdown voltage | kV | ≥7 | ≥7 | ≥7 | ≥10 | ≥10 | ≥10 | ≥15 | ≥18 | ≥18 | |
Tensile and shear strength | Mpa | ≥3.0 | |||||||||
Heat shrinkage rate |
Crosswise | % | ≤1.0 | ||||||||
Lengthwise | ≤2.0 | ||||||||||
Appearance | Soft,smooth free of any delamination impurity,damage,crack,blister. | ||||||||||
Color | Red,Brown,White | ||||||||||
Thermal rating class | ºC | ≥155 |
Characters
Heat-resistance: F Class (155ºC) :F(155ºC)
Good mechanical properties
Product quality: With consistent quality control throughout the entire process of product design and development, material procurement, production, quality inspection, and sales, the company has passed strict quality system certification and has been widely recognized by well-known customers. The company's products have advantages in quality.
Customer visit
Q: How you make sure the quality?
a. We will consult on your requirements, and recommend suitable products to you.
b. Before production, we will send samples to you
c. During production, we will always check quality, package, delivery etc.
d. Before package, with QA to check everything
e. After shipment, we will consult with you about satisfaction.
Q: How to make sure the delivery date?
a. Before production, we will see we can meet your time or not.
b. After your payment, we start our preparing material immediately.
c. During production, We will inform you of the production scheduled.
d. Before shipment, we will inform you to pay the balance on time and booking immediately.